3. Correct Positioning: The Memorial Base must be positioned on the concrete base making sure the slot lines up.
4. The Stone-safe Lifting Clamp: The Memorial is carefully raised and guided through the slot until resting on the ground.
5. The Memorial is Inserted: at the back of the concrete base through the memorial 2 x 12mm stainless steel through bolts (marked with red arrows) and tightened. The memorial is now resting on the ground and on the bolts.
6. Sealant is Added: between the joint of the Memorial and base.
7. The Earth is Backfilled: The turf is replaced and left sound, resulting in a secure, sturdy fitting.
|